🛣️ About the project

The 3 Street NE/NW corridor, nestled in the Riverside neighbourhood, serves as a vital transportation route and connection to residential, commercial, and community services for our community.

The Riverside Corridor Enhancement Project focuses on 3 Street North (NE/NW), a roughly twokilometre corridor through the Riverside neighbourhood. The road connects homes, local businesses, transit, and neighbourhood destinations, and is also used by people travelling through Riverside to access other parts of the city, seeing around 4,000 vehicles daily. Originally built as Highway1, 3StreetNorth was designed for higher speeds and different traffic patterns than it serves today. It now functions as a neighbourhood collector, balancing local access, parking, transit, pedestrians, cyclists, emergency vehicles, and through traffic.

The roadway and underground infrastructure are now in very poor condition. Ongoing surface repairs are no longer effective due to aging utilities, drainage issues, and settlement. This project combines roadway renewal, deep utility upgrades, and safety improvements into a single, coordinated investment intended to last 30–50 years, helping avoid repeated construction and future disruption.

The $7.45million surface project was approved in 2025. Approximately 98% of the funding comes from federal and provincial programs, with the remaining portion funded through existing City capital reserves and no direct impact on municipal property taxes. Because projects of this scale come around once-in-a-generation, we are asking for the public’s help in determining a design that works for area residents today, but also for residents who will use this design for the next 30-50 years.

No decisions have been made yet. We are asking for public feedback on a revised design for this corridor. Keep reading to learn more about how you can influence aspects of the design!


👉 [for those who want technical details]

👉 [easiest way to visualize]

🛻Real-world road comparison, 20 Street NE is the same width and function

👉 [see a similar street in use]



📌 Why this is being considered

Several factors come together on this corridor:

⚙️ Infrastructure condition

  • Since 2018, the City has recorded 276 service requests related to road condition, drainage, icing, and surface failures.

  • The area requires deep utility upgrades (water, sewer, storm, sanitary, gas, electric). 

  • This new infrastructure addresses known issues, improves reliability, and prevents costly emergency repairs. 

🚦 Safety and speeding

  • Between 2012 and 2021, there were 156 reported collisions, including 27 injury collisions and one fatality.

  • Speed data shows vehicles travelling above the posted limit, reinforcing long-standing community concerns about speeding and safety.

  • The proposed design incorporates traffic calming measures shown to reduce speed, reduce severity of accidents, and improve safety.

🔄 Longterm planning

  • Coordinating underground and surface work now helps reduce emergency repairs, repeated road closures, and longterm disruption to residents and businesses.

🚶♀️Neighbourhood preferences

  • Engaging with the residents and businesses throughout this project to understand trade-offs and needs to come up with a design that works for all.


🎯 Project goals

The primary driver of this project is improved safety for all users, informed by resident feedback, traffic data, and collision history. At the same time, the project addresses infrastructure reliability and how the corridor functions daytoday.

Safety 🚥

  • Use proven design standards that support safer vehicle speeds

  • Improve pedestrian visibility and shorten crossing distances

  • Provide consistent lighting throughout the corridor

Accessibility & connectivity 🚶♀️🚴

  • Include a multiuse pathway shared by pedestrians, cyclists, etc.

  • Improve accessibility for seniors, families, and people using mobility devices

  • Support connections to the citywide trail network for everyday trips, not just recreation

  • Maintain parking as is throughout

User experience & infrastructure reliability 🌳

  • Reduce recurring potholes and surface failures

  • Preserve all mature trees

  • Improve drainage to reduce ponding and icing

  • Add targeted amenities such as benches, garbage receptacles, bike racks, and upgraded bus stop pads

  • Maintain access to local businesses for customers, deliveries, and transit users

The project aligns with ‘complete streets’ designs balancing traffic calming principles, promoting active modes of transportation, and maintaining the functionality of this arterial roadway for vehicle traffic. To learn more about the 'complete streets' concept, check out these design standards. You can also read this case study paper on complete streets.




🗣 What we’ve heard so far

The first phase of engagement collected feedback from the community on the conceptual design. Feedback focused primarily on safety, road function, parking, construction impacts, and trust in the process.

  1. Clarity and trustTo work together on determining an accepted design for the neighbourhood, to feel heard and improve communication, and see how feedback is used to refine the design.

  1. 🚦 Speeding and pedestrian safety – Concerns about vehicle speeds, collision risk, and feeling unsafe crossing the street in certain locations.

  1. 📏 Road width and maneuverability – Questions about emergency access, large vehicles and trailers access, winter driving conditions, and neighbourhood feel with the proposed road width.

  1. 🚸 Crossings and bulbouts – Desire for safer, more visible crossings, alongside concerns about too many bulbouts and turning radius.

  1. 🚶♀️🚴 Multiuse pathway Interest in accessibility and connectivity, with differing views on trail location and intended use.

  1. 🚗♿ Parking and access – Ongoing concern about maintaining onstreet parking for residents, businesses, customers, and accessible users.

  1. 💡 Lighting and amenities – Interest in improved lighting and basic amenities, especially near the commercial district and bus stops.

  1. 🌳 Boulevard landscaping – Preference for green, treelined streets, with questions about maintenance responsibilities and winter conditions for trails and boulevards.

  1. 👷 Construction impacts – Access, duration, communication, and business impacts during construction.

  1. 💰 Value and proportionality – Questions about whether this is a necessary and proportionate longterm investment.


🔄 What has changed since the first concept design

Based on public feedback received after the April2025 concept design, the project has moved into Phase2, with the following key refinements:

  • All deep utilities will be upgraded, reducing the need for future excavation

  • Removal of the roundabout.

  • Removal of 57 total bulbouts

  • Only 7 bulbouts remain, located at highpriority pedestrian crossings

  • Remaining bulbouts have been significantly relaxed to allow smoother turns

  • ↔️ 8 of 15 intersections remain as is, providing ample turning space for larger trucks and trailers

  • 🚸 7 enhanced pedestrian crossings, including 5 with rapid flashing beacons and accessibility features

  • 🚗 The same amount of onstreet parking as exists today, with all accessible/loading stalls preserved

  • 💡 Improved lighting and added amenities in key areas, including the business district

  • 🌳 Boulevard landscaping will be determined blockbyblock, with a preference for green landscaping


📊 How decisions are made

This phase of the project shows a second revised design and offers an opportunity for residents to weigh-in on a variety of design features through the online survey.

Final decisions on this project will consider:

  • Community feedback

  • Traffic and collision data

  • Engineering and accessibility standards

  • Longterm infrastructure performance

  • Funding and regulatory requirements

While not all feedback can be incorporated, it directly informs how tradeoffs are evaluated. City Council will be presented with the public’s feedback to help inform future decisions and design for this project.

When planning safer streets, traffic safety is commonly viewed through the “3Es framework:

  • Engineering – how the street is built, including road width, crossings, curbs, and lighting

  • Education – helping people understand what to expect on the road through visibility, clear layouts, and predictable design

  • Enforcement – speed limits, rules of the road, and policing

While enforcement and education are important, changes to the physical design of the street are proven to be one of the most effective ways to reduce vehicle speeds and the severity of collisions. That is especially true on long, wide roads where enforcement alone is limited.

Community feedback has consistently highlighted concerns about speeding along this corridor. During the development of the Riverside Neighbourhood Plan, residents raised issues about traffic speeds and safety, particularly for children, seniors, and other vulnerable road users. These concerns are echoed in ongoing service requests and collision data and speed maps all pointing to a need for infrastructure improvements on this stretch of road.

In addition to public feedback and data, this project is guided by established plans and standards. The City’s Municipal Development Plan supports safe travel and active transportation as the city grows, and is guided by the draftTransportation Master Plan. Road design and safety features also follow national standards set by the Transportation Association of Canada, ensuring the corridor meets recognized safety and accessibility requirements.

Some elements must meet engineering, safety, and accessibility standards and are not open to change. Other elements can still be refined, and those are the focus of this phase of engagement.


🤝 Who is involved

Riverside is one of the oldest and most diverse neighbourhoods within the City of Medicine Hat. This project directly impacts the residents and businesses of the Riverside neighbourhood, but also impacts commuters and drivers who frequently use 3rd Street as a connection to the various facilities in the area, including our historic downtown area.

  • Residents and businesses along 3StreetNorth

  • Community organizations, including the Riverside Neighbourhood Association

  • People who use the corridor regularly

  • City staff and engineering consultants

  • City Council


How to get involved

1. 📄 Review the project materials

Before completing the survey, please:


2. 🏫 Attend an open house

Open houses will take place at Elks Hall (3053StreetNW, MedicineHat). City staff and project team members will be available to answer questions and discuss elements that are still being refined.

Wednesday, May27

  • 🕚 11a.m.1 p.m.

  • 🕓 47p.m. (Riverside residentsonly session)

Please note: This evening session is being held in collaboration with the Riverside Neighbourhood Association’s annual BBQ and may be busy. Residents who prefer longer conversations, or who have hearing or mobility considerations, are encouraged to attend one of the other open house times.

Tuesday, June2

  • 🕚 11a.m.1p.m.

  • 🕓 46p.m.

  • The survey is open May13 to June15,2026

  • It takes approximately 25 minutes to complete all questions are optional and anonymous

  • If you need assistance completing the survey, support will be available at the open houses.

Completing the survey formally records your feedback. Survey results will be summarized and shared publicly after the survey closes.


⏭️ What’s next

  • Survey feedback will be summarized and shared publicly this summer

  • Design refinements will continue toward final detailed design

  • Construction is tentatively planned to begin in 2027

  • Timing is subject to funding agreements, weather, and final approvals

🛣️ About the project

The 3 Street NE/NW corridor, nestled in the Riverside neighbourhood, serves as a vital transportation route and connection to residential, commercial, and community services for our community.

The Riverside Corridor Enhancement Project focuses on 3 Street North (NE/NW), a roughly twokilometre corridor through the Riverside neighbourhood. The road connects homes, local businesses, transit, and neighbourhood destinations, and is also used by people travelling through Riverside to access other parts of the city, seeing around 4,000 vehicles daily. Originally built as Highway1, 3StreetNorth was designed for higher speeds and different traffic patterns than it serves today. It now functions as a neighbourhood collector, balancing local access, parking, transit, pedestrians, cyclists, emergency vehicles, and through traffic.

The roadway and underground infrastructure are now in very poor condition. Ongoing surface repairs are no longer effective due to aging utilities, drainage issues, and settlement. This project combines roadway renewal, deep utility upgrades, and safety improvements into a single, coordinated investment intended to last 30–50 years, helping avoid repeated construction and future disruption.

The $7.45million surface project was approved in 2025. Approximately 98% of the funding comes from federal and provincial programs, with the remaining portion funded through existing City capital reserves and no direct impact on municipal property taxes. Because projects of this scale come around once-in-a-generation, we are asking for the public’s help in determining a design that works for area residents today, but also for residents who will use this design for the next 30-50 years.

No decisions have been made yet. We are asking for public feedback on a revised design for this corridor. Keep reading to learn more about how you can influence aspects of the design!


👉 [for those who want technical details]

👉 [easiest way to visualize]

🛻Real-world road comparison, 20 Street NE is the same width and function

👉 [see a similar street in use]



📌 Why this is being considered

Several factors come together on this corridor:

⚙️ Infrastructure condition

  • Since 2018, the City has recorded 276 service requests related to road condition, drainage, icing, and surface failures.

  • The area requires deep utility upgrades (water, sewer, storm, sanitary, gas, electric). 

  • This new infrastructure addresses known issues, improves reliability, and prevents costly emergency repairs. 

🚦 Safety and speeding

  • Between 2012 and 2021, there were 156 reported collisions, including 27 injury collisions and one fatality.

  • Speed data shows vehicles travelling above the posted limit, reinforcing long-standing community concerns about speeding and safety.

  • The proposed design incorporates traffic calming measures shown to reduce speed, reduce severity of accidents, and improve safety.

🔄 Longterm planning

  • Coordinating underground and surface work now helps reduce emergency repairs, repeated road closures, and longterm disruption to residents and businesses.

🚶♀️Neighbourhood preferences

  • Engaging with the residents and businesses throughout this project to understand trade-offs and needs to come up with a design that works for all.


🎯 Project goals

The primary driver of this project is improved safety for all users, informed by resident feedback, traffic data, and collision history. At the same time, the project addresses infrastructure reliability and how the corridor functions daytoday.

Safety 🚥

  • Use proven design standards that support safer vehicle speeds

  • Improve pedestrian visibility and shorten crossing distances

  • Provide consistent lighting throughout the corridor

Accessibility & connectivity 🚶♀️🚴

  • Include a multiuse pathway shared by pedestrians, cyclists, etc.

  • Improve accessibility for seniors, families, and people using mobility devices

  • Support connections to the citywide trail network for everyday trips, not just recreation

  • Maintain parking as is throughout

User experience & infrastructure reliability 🌳

  • Reduce recurring potholes and surface failures

  • Preserve all mature trees

  • Improve drainage to reduce ponding and icing

  • Add targeted amenities such as benches, garbage receptacles, bike racks, and upgraded bus stop pads

  • Maintain access to local businesses for customers, deliveries, and transit users

The project aligns with ‘complete streets’ designs balancing traffic calming principles, promoting active modes of transportation, and maintaining the functionality of this arterial roadway for vehicle traffic. To learn more about the 'complete streets' concept, check out these design standards. You can also read this case study paper on complete streets.




🗣 What we’ve heard so far

The first phase of engagement collected feedback from the community on the conceptual design. Feedback focused primarily on safety, road function, parking, construction impacts, and trust in the process.

  1. Clarity and trustTo work together on determining an accepted design for the neighbourhood, to feel heard and improve communication, and see how feedback is used to refine the design.

  1. 🚦 Speeding and pedestrian safety – Concerns about vehicle speeds, collision risk, and feeling unsafe crossing the street in certain locations.

  1. 📏 Road width and maneuverability – Questions about emergency access, large vehicles and trailers access, winter driving conditions, and neighbourhood feel with the proposed road width.

  1. 🚸 Crossings and bulbouts – Desire for safer, more visible crossings, alongside concerns about too many bulbouts and turning radius.

  1. 🚶♀️🚴 Multiuse pathway Interest in accessibility and connectivity, with differing views on trail location and intended use.

  1. 🚗♿ Parking and access – Ongoing concern about maintaining onstreet parking for residents, businesses, customers, and accessible users.

  1. 💡 Lighting and amenities – Interest in improved lighting and basic amenities, especially near the commercial district and bus stops.

  1. 🌳 Boulevard landscaping – Preference for green, treelined streets, with questions about maintenance responsibilities and winter conditions for trails and boulevards.

  1. 👷 Construction impacts – Access, duration, communication, and business impacts during construction.

  1. 💰 Value and proportionality – Questions about whether this is a necessary and proportionate longterm investment.


🔄 What has changed since the first concept design

Based on public feedback received after the April2025 concept design, the project has moved into Phase2, with the following key refinements:

  • All deep utilities will be upgraded, reducing the need for future excavation

  • Removal of the roundabout.

  • Removal of 57 total bulbouts

  • Only 7 bulbouts remain, located at highpriority pedestrian crossings

  • Remaining bulbouts have been significantly relaxed to allow smoother turns

  • ↔️ 8 of 15 intersections remain as is, providing ample turning space for larger trucks and trailers

  • 🚸 7 enhanced pedestrian crossings, including 5 with rapid flashing beacons and accessibility features

  • 🚗 The same amount of onstreet parking as exists today, with all accessible/loading stalls preserved

  • 💡 Improved lighting and added amenities in key areas, including the business district

  • 🌳 Boulevard landscaping will be determined blockbyblock, with a preference for green landscaping


📊 How decisions are made

This phase of the project shows a second revised design and offers an opportunity for residents to weigh-in on a variety of design features through the online survey.

Final decisions on this project will consider:

  • Community feedback

  • Traffic and collision data

  • Engineering and accessibility standards

  • Longterm infrastructure performance

  • Funding and regulatory requirements

While not all feedback can be incorporated, it directly informs how tradeoffs are evaluated. City Council will be presented with the public’s feedback to help inform future decisions and design for this project.

When planning safer streets, traffic safety is commonly viewed through the “3Es framework:

  • Engineering – how the street is built, including road width, crossings, curbs, and lighting

  • Education – helping people understand what to expect on the road through visibility, clear layouts, and predictable design

  • Enforcement – speed limits, rules of the road, and policing

While enforcement and education are important, changes to the physical design of the street are proven to be one of the most effective ways to reduce vehicle speeds and the severity of collisions. That is especially true on long, wide roads where enforcement alone is limited.

Community feedback has consistently highlighted concerns about speeding along this corridor. During the development of the Riverside Neighbourhood Plan, residents raised issues about traffic speeds and safety, particularly for children, seniors, and other vulnerable road users. These concerns are echoed in ongoing service requests and collision data and speed maps all pointing to a need for infrastructure improvements on this stretch of road.

In addition to public feedback and data, this project is guided by established plans and standards. The City’s Municipal Development Plan supports safe travel and active transportation as the city grows, and is guided by the draftTransportation Master Plan. Road design and safety features also follow national standards set by the Transportation Association of Canada, ensuring the corridor meets recognized safety and accessibility requirements.

Some elements must meet engineering, safety, and accessibility standards and are not open to change. Other elements can still be refined, and those are the focus of this phase of engagement.


🤝 Who is involved

Riverside is one of the oldest and most diverse neighbourhoods within the City of Medicine Hat. This project directly impacts the residents and businesses of the Riverside neighbourhood, but also impacts commuters and drivers who frequently use 3rd Street as a connection to the various facilities in the area, including our historic downtown area.

  • Residents and businesses along 3StreetNorth

  • Community organizations, including the Riverside Neighbourhood Association

  • People who use the corridor regularly

  • City staff and engineering consultants

  • City Council


How to get involved

1. 📄 Review the project materials

Before completing the survey, please:


2. 🏫 Attend an open house

Open houses will take place at Elks Hall (3053StreetNW, MedicineHat). City staff and project team members will be available to answer questions and discuss elements that are still being refined.

Wednesday, May27

  • 🕚 11a.m.1 p.m.

  • 🕓 47p.m. (Riverside residentsonly session)

Please note: This evening session is being held in collaboration with the Riverside Neighbourhood Association’s annual BBQ and may be busy. Residents who prefer longer conversations, or who have hearing or mobility considerations, are encouraged to attend one of the other open house times.

Tuesday, June2

  • 🕚 11a.m.1p.m.

  • 🕓 46p.m.

  • The survey is open May13 to June15,2026

  • It takes approximately 25 minutes to complete all questions are optional and anonymous

  • If you need assistance completing the survey, support will be available at the open houses.

Completing the survey formally records your feedback. Survey results will be summarized and shared publicly after the survey closes.


⏭️ What’s next

  • Survey feedback will be summarized and shared publicly this summer

  • Design refinements will continue toward final detailed design

  • Construction is tentatively planned to begin in 2027

  • Timing is subject to funding agreements, weather, and final approvals

  • Please take 25 minutes to complete this survey once you have reviewed the revised design for Riverside CorridorYou can choose to answer anonymously or provide your contact information. 