Southeast Medicine Hat

Share Southeast Medicine Hat on Facebook Share Southeast Medicine Hat on Twitter Share Southeast Medicine Hat on Linkedin Email Southeast Medicine Hat link

Medicine Hat is currently reviewing options (stronger structures or relocation) to build line capacity on the existing transmission line in your community that we call 30L primarily along South Boundary Road SE.

We have reached the next stage in the project, where we are introducing alternative scenarios for the transmission line. Each scenario presents different options for the poles, either changing the height or relocating them. When upgrading a transmission line, various factors are carefully considered and evaluated.

These factors include potential environmental impacts, visual concerns, proximity to residences, the number of residences in the area, technical and engineering limitations, agricultural effects, project costs, and other factors. While it may not always be apparent, there are situations where relocating the transmission line may result in the least potential impact, while in other cases, leaving the line in its current position may be the least impactful option.

Working with the community is essential for us to determine what scenarios should be submitted for regulatory approval.


Southeast map showing existing line and alternative scenarios





Medicine Hat is currently reviewing options (stronger structures or relocation) to build line capacity on the existing transmission line in your community that we call 30L primarily along South Boundary Road SE.

We have reached the next stage in the project, where we are introducing alternative scenarios for the transmission line. Each scenario presents different options for the poles, either changing the height or relocating them. When upgrading a transmission line, various factors are carefully considered and evaluated.

These factors include potential environmental impacts, visual concerns, proximity to residences, the number of residences in the area, technical and engineering limitations, agricultural effects, project costs, and other factors. While it may not always be apparent, there are situations where relocating the transmission line may result in the least potential impact, while in other cases, leaving the line in its current position may be the least impactful option.

Working with the community is essential for us to determine what scenarios should be submitted for regulatory approval.


Southeast map showing existing line and alternative scenarios





  • Scenarios

    Share Scenarios on Facebook Share Scenarios on Twitter Share Scenarios on Linkedin Email Scenarios link